A Transport Assessment was produced that included detailed analysis of historic and current trip data, to demonstrate that the proposals would not detrimentally affect the existing industrial estate or junctions located on the A249 principal route.
Site layout advice was provided to demonstrate that the proposals could operate satisfactorily in the context of access and internal site layout.
This analysis was subsequently accepted by Kent Highway Services and planning permission was granted by the Waste Authority.