DHA has secured consent to create two new holiday lets and a new purpose-built recording studio.
The proposed new buildings for DHA’s longstanding client, Pickhill Developments, will involve the demolition of two dilapidated timber stables, retaining the existing central brick-built section, and be built on the same footprint as the existing stables at the farm in Marden. In addition, a new recording studio will be built adjacent to the holiday lets.